Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Each Additional1.00.7AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings1.00.0A
Crankshaft4.00.0A
Oil Pump0.80.0A
Oil Pump Screen, Clean0.20.0A
Rear Main Oil Seal, Renew1.40.0A
Timing Chain or Gear, Renew1.50.0A
Tune Up0.60.0A
One Cylinder
Right Bank11.88.4AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
Left Bank12.08.6AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
Both Banks15.010.7AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
All Cylinders16.711.9AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.