Operation CHARM: Car repair manuals for everyone.

Engine: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Complete Assembly With Transfer of Parts8.86.4BIncludes: Transfer All Fuel & Electrical Units. Does Not Include Transfer Of Optional Equipment.
Note
With AC, Add0.70.4B
With Locking Wheel Covers, Add0.20.0B
With Locking Lug Nuts, Add0.20.0B
Complete Assembly Without Transfer of Parts6.40.0BDoes Not Include: Transfer Of Any Part Of Engine Or Replacement Of Optional Equipment.
Note
With AC, Add0.70.0B
With Locking Wheel Covers, Add0.20.0B
With Locking Lug Nuts, Add0.20.0B
Long Block17.70.0BIncludes: R&I Engine & Transfer All Necessary Components Not Supplied With Long Block
Note
With A/C, Add0.80.5A
With A.I.R. Pump, Add0.60.5B
With Locking Wheel Covers, Add0.20.0A
With Locking Lug Nuts, Add0.20.0A
Short Block20.110.7A
Short Block (Partial)14.710.7AIncludes: R&R Engine & Transfer All Necessary Parts.
NOTE
With AC, Add1.00.7A
To Grind Valves, Add2.82.0A
With Locking Wheel Covers, Add0.20.0A
With Locking Lug Nuts, Add0.20.0A
Overhaul/Rebuild
With Turbo27.60.0AIncludes: Measure Cylinder Bores, Crankshaft & Pistons For Proper Size & Hone Cylinders. Renew Pistons. Rings. Pins. Main & Rod Bearings, Grind Valves & Tune-Up.
Without Turbo27.10.0AIncludes: Measure Cylinder Bores, Crankshaft & Pistons For Proper Size & Hone Cylinders. Renew Pistons. Rings. Pins. Main & Rod Bearings, Grind Valves & Tune-Up.
NOTE
With A/C, Add0.50.0A
With A.I.R. Pump, Add0.70.0AIncludes: Measure Cylinder Bores, Crankshaft & Pistons For Proper Size & Hone Cylinders. Renew Pistons. Rings. Pins. Main & Rod Bearings, Grind Valves & Tune-Up.
With Locking Wheel Covers, Add0.20.0A
With Locking Lug Nuts, Add0.20.0A