Operation CHARM: Car repair manuals for everyone.

Engine: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Complete Assembly With Transfer of Parts14.710.2BIncludes: Transfer All Fuel & Electrical Units. Does Not Include Transfer Of Optional Equipment.
Note
With AC, Add0.70.4B
With Locking Wheel Covers or Lug Nuts, Add0.20.1B
Complete Assembly Without Transfer of Parts10.20.0BDoes Not Include: Transfer Of Any Part Of Engine Or Replacement Of Optional Equipment.
Note
With AC, Add0.70.0B
With Locking Wheel Covers or Lug Nuts, Add0.20.0B
Long Block19.20.0AIncludes: R&I Engine & Transfer All Necessary Components Not Supplied With Long Block.
Note
With AC, Add0.70.4A
With Locking Wheel Covers or Lug Nuts, Add0.20.1A
Short Block22.212.5AIncludes: R&I Engine & Transfer All Necessary Equipment.
Note
With AC, Add0.70.4A
With Locking Wheel Covers or Lug Nuts, Add0.20.1A
To Grind Valves, Add2.82.0A
Overhaul/Rebuild30.50.0AIncludes: Measure Cylinder Bores, Crankshaft & Pistons For Proper Size & Hone Cyliners. Renew Pistons Rings, Pins, Main & Rod Bearings, Grind Valves And Tune Up.
Note
With AC, Add0.70.0A
With Locking Wheel Covers or Lug Nuts, Add0.20.0A