Operation CHARM: Car repair manuals for everyone.

EVAP Hoses/Pipes Replacement - Engine/Chassis

REMOVAL PROCEDURE




1. Disconnect the chassis purge pipe from the engine purge pipe.
2. Plug the engine purge pipe and chassis purge pipe to prevent contamination.
3. Raise the vehicle. Refer to Lifting and Jacking the Vehicle.
4. Disconnect the chassis purge pipe from the canister purge pipe.
5. Plug the canister purge pipe and chassis purge pipe to prevent contamination.
6. Remove the exhaust heat shield.
7. Remove the fuel bundle mounting bolts from the body clips.




8. Remove the chassis purge pipe from the body clips.




9. Remove the chassis purge pipe (1) to be serviced.

INSTALLATION PROCEDURE

NOTE: Refer to Fastener Notice in Service Precautions.




1. Install the chassis purge pipe and hardware (1).




2. Position the chassis purge pipe in the body clips.

NOTE: Refer to Fastener Notice in Service Precautions.




3. Install the fuel bundle mounting bolts into the body clips.

Tighten
Tighten the bolts to 6 N.m (53 lb in).

4. Install the exhaust heat shield.

Tighten
^ Tighten the exhaust shield bolt to 2 N.m (18 lb in).
^ Tighten the exhaust shield nuts to 1 N.m (9 lb in).

5. Remove the caps on the chassis purge pipe and canister purge pipe.
6. Connect the chassis purge pipe to the canister purge pipe.
7. Lower the vehicle.
8. Remove the caps on the engine purge pipe and chassis purge pipe.
9. Connect the chassis purge pipe to the engine purge pipe.