94. Supercharger Installation
1. Install the supercharger gasket.
2. Install the supercharger.
Notice: Refer to Fastener Notice in Service Precautions
3. Install the bolts and stud to the supercharger in the proper locations.
^ Tighten the stud/bolts to 23 Nm (17 ft. lbs.).
4. Install the throttle body and seal.
5. Install the throttle body bolts and nuts.
^ Tighten the throttle body bolts and nuts to 10 Nm (89 in. lbs.).
6. Install the MAP/BARD sensor bracket and bolts.
^ Tighten the MAP/BARD sensor bracket bolts to 30 Nm (22 ft. lbs.).
7. Install the MAP and BARO sensors.
8. Install the MAP and BARO sensor retaining clips.
9. Install the engine wiring harness heat shield.
10. Install the engine wiring harness heat shield bolt and nut.
^ Tighten the engine wiring harness heat shield bolt and nut to 10 Nm (89 in. lbs.).
11. Install the supercharger bypass valve, hose and nut.
^ Tighten the supercharger bypass valve nut to 10 Nm (89 in. lbs.).
12. Install the fuel rail.
13. Install the fuel rail nuts.
^ Tighten the fuel rail nuts to 10 Nm (89 in. lbs.).
14. Install the supercharger bypass valve harness.
15. Install the wiring harness to the fuel rail.
16. Install the spark plug wires to the retaining clips and spark plugs.