Operation CHARM: Car repair manuals for everyone.

Control Module HVAC: Service and Repair



BLOWER MOTOR CONTROL PROCESSOR REPLACEMENT

REMOVAL PROCEDURE
1. Remove the right closeout panel.
2. Remove the blower motor control processor wire harness connector.
3. Remove the blower motor control processor screws.




4. Remove the blower motor control processor.

INSTALLATION PROCEDURE




1. Install the blower motor control processor.
2. Tighten the blower motor control processor screws.

NOTE: Refer to Fastener Notice.

Tighten the screws to 1.5 N.m (13 lb in).

3. Install the blower motor control processor wire harness connector.
4. Install the right closeout panel.