Operation CHARM: Car repair manuals for everyone.

Turbo Breather Hose - Revised

Group: 21

Number: 82-O1

Date: July 30, 1982

Subject: Breather Hose for Turbocharger

Key Points: Breather Hose Changed

The breather hose between turbocharger and crank case has been replaced by a metal pipe connected from the oil return hose at the turbocharger directly to the cylinder head

Note:
New breather pipe was installed beginning with VIN 93CN150503




Parts required

1 End plate 93110404100
1 Gasket 059127311A
2 Plain washer N 011 525 13
2 Socket head screw N 014 710 3
1 Pipe 931 107 219 01
1 Foam rubber hose 477 209 303
1 Shaped hose 931110 181 00
3 Hose clamp N 0245101
1 End cap 930 110 256 01
1 Round seal 999 701 477 40
1 Valve cover gaskets 060 198 025


Breather pipe installing (earlier cars)

Work sequence

- remove suction/pressure line between turbocharger and intake air sensor, and cover opening of pressure line with a clean rag

- remove valve cover

- disconnect all fuel lines at injectors





- locate and center punch for hole in center of cylinder head flange near No. 1 fuel injector (arrow)

- drill a 13mm (1/2 inch) diameter hole

Caution:
To prevent shavings from getting inside engine, grease engine flange area before drilling, and coat drill bit with grease

- remove rag and clean up shavings

- reinstall valve cover

- remove air cleaner upper and lower sections. Disconnect mixture control unit with lower section and lay aside; do this by unscrewing hexagon nuts and removing dust cover and vent hose from oil separator on lower section. Do not unscrew fuel lines

- cut off old vent hose on turbocharger such that approximately 60 mm of hose remains on adapter

- bolt down end plate with gasket, washers and 8 x 20 bolts. The connecting tube must face up

- push pipe onto piece of hose and secure with hose clamp

- push on foam rubber part

- push shaped hose onto pipe and connecting adapter

- install hose clamps

- remove old hose leading to branch on crankcase vent hose

- plug opening in branch with an end cap, Part No.930 110 256 01

^ install hose clamp

- reinstall mixture Control unit, making sure dust cover is positioned correctly

- reinstall fuel lines at injectors

- reinstall suction/pressure line

- reinstall air cleaner

- check engine idle speed and % off CO

Labor Operation: 10 52 34 0
Time Allowance: 140 T.U.