Fit the Holder on the Cart
3.1 Fit long tube of the folding supports (figure 2, item 1) into the bearings (item 2) on the open side of the angle section and screw into place (6 x 45 allen head bolt and 6 mm nut). Unfold the support, insert the short tube at the opposite bearing and screw into place.3.2 Unscrew both clamping pieces (T-shaped) and prefit them in the area of the outer bores of the long cross tube. If the tube clamps for the wall mounting are in this area, they must be removed.
3.3 Insert short support tube (figure 2, item 7) into the clamping piece (elbow shaped) on the short cross tube, align, and screw into place.
3.4 Push holder with the clamping pieces onto the supports. Align holder with the supports and with the bearings on the angle section.
3.5 Insert short support tube into bearing at the angle section and screw into place. Securely screw both clamping pieces (T-shaped) of the long cross tube onto the supports.
3.6 Check to ensure that all screw connections are tight, and hang the storage baskets (figure 2, item, 8) at the sides of the cart frame.