Part 1
WM 1001IN Tightening torques, tightening sequences, assembly overviews for V8 4.8 l DFI naturally aspirated and turbo engine up to October 2008
Technical values
Technical values
Overview
Information
- The tightening steps in the tightening sequences relate to tightening screws uniformly, i.e. all affected screws must first be tightened uniformly to the first torque value, then all screws are tightened one stage further, and so on.
- Replace all O- rings following removal.
The torques in the table below generally apply to screws that are not specifically listed =>
The bolt quality is indicated on the screw head at the top as a decimal number, e.g. "8.8" or "12.9".
Aluminium screws
Group 10 up to October 2008
Upper part of crankcase
Lower part of crankcase
Sealant application
Tightening sequence for thrust-bearing screws
Tightening sequence for securing lower part of crankcase to upper part of crankcase (cross bolt connection)
Left bracket for auxiliary units and engine mounting
Right bracket for auxiliary units and engine mounting
Vent line
Oil mist separator for positive crankcase ventilation (M48/51 turbo engine)
Oil mist separator for positive crankcase ventilation (M48/01 naturally aspirated engine)
Positive crankcase ventilation, M48/51 Turbo
Positive crankcase ventilation (PCV), M48/51 Turbo
Group 13 up to October 2008
Crankshaft
Belt drive
Piston, connecting rod
Connecting-rod assembly, bearing shells
Piston classification
Radial shaft seal
Pulleys
Group 15 up to October 2008
Valves (cylinder bank 5 to 8)
Cylinder head 1 to 4
Cylinder head 5 to 8
Tightening sequence for cylinder head