Secondary Pivot Arm Timing Chain Guide Installation - Right Side
Secondary Pivot Arm Timing Chain Guide Installation - Right Side1. Ensure that the secondary pivot arm timing chain guide bank 1 (1) is being installed.
2. Install the secondary pivot arm timing chain guide (1).
3. Refer to Fastener Caution.
Install the secondary pivot arm timing chain guide bolt (2) and tighten to 23 Nm (17 lb ft).