Instrument Panel Electrical Center or Junction Block Replacement
INSTRUMENT PANEL ELECTRICAL CENTER OR JUNCTION BLOCK REPLACEMENT
REMOVAL PROCEDURE
1. Disconnect the negative battery cable.
2. Remove the instrument panel (I/P) right side endcap cover.
3. Remove the I/P compartment.
4. Remove the 2 forward screws (1) securing the I/P accessory wiring junction block assembly to the I/P carrier.
5. Remove the 2 nuts (1) securing the I/P accessory wiring junction block assembly bracket (2) to the I/P carrier.
6. Lower the I/P electrical center bracket and swing the junction block into the stowage compartment area.
7. Squeeze and release the retaining tabs from the shroud/base in order to release the electrical connector from the I/P wiring harness.
8. Walk off the I/P accessory wiring junction block assembly from the connector.
9. Ensure the main harness is secured into the lower shroud/base.
IMPORTANT: Re-stage the connectors (2) into the lower I/P accessory wiring junction block assembly base/shroud (1) prior to installing the new I/P wiring harness junction block.
INSTALLATION PROCEDURE
1. Verify that the harness connectors are securely locked to the retention tabs (3).
2. Position the connector (1) to the I/P wiring harness junction block.
3. Once the connector is aligned, carefully squeeze the connector to the base until both outer locking tabs are secure.
4. Repeat step 3 for the additional connectors.
5. Position the I/P wiring harness junction block bracket (2) back to the I/P carrier bracket studs.
6. Install the nuts (1).
NOTE: Refer to Fastener Notice in Service Precautions.
Tighten the nuts to 10 N.m (89 lb in).
7. Secure the 2 screws (1) at the I/P endcap.
Tighten the screws to 2 N.m (18 lb in).
8. Install the I/P compartment.
9. Install the I/P right side end cap cover.
10. Connect the negative battery cable.
11. Perform the power sliding door re-initialization procedure. Refer to Acutator Control Module - Power Sliding Door (PSD) Programming and Setup.