Operation CHARM: Car repair manuals for everyone.

Grounds Circuits Testing

I/P Splice Pack # 1
Location: Taped to harness behind I/P cluster.
The systems grounded by I/P Splice Pack #1 are grounded redundantly with I/P Splice Pack #2 at ground point location D (I/P chassis ground). If one of the following systems is operating normally, the ground circuit is most likely good.
^ Transaxle shift program switch
^ I/P dimmer
^ Cruise control
^ Headlamp switch
^ Cigar lighter element
Check for OPENS/SHORTS.
Repair as needed.
If this component is good go to the next item indicated on the Complaint-Condition Chart.