Installation
1. Apply sealant with Teflon P/N 21485278 or equivalent on threads before installing.2. Install switch
Torque: 38 Nm (28 ft. lbs.)
3. Connect electrical connector to switch.
4. Install air induction system. [Double Overhead Cam (DOHC) shown, Single Overhead Camshaft (SOHC) similar.]