L81 - Torquing Procedure
1. Disconnect negative battery cable.2. Torque suction pipe-to-compressor bolt.
Torque:
Suction Pipe-to-Compressor
Bolt: 19 Nm (14 ft-lbs)
CAUTION:
MAKE SURE VEHICLE IS PROPERLY SUPPORTED AND SQUARELY POSITIONED ON THE HOIST. TO HELP AVOID PERSONAL INJURY WHEN A VEHICLE IS ON A HOIST, PROVIDE ADDITIONAL SUPPORT FOR THE VEHICLE ON THE OPPOSITE END FROM WHICH COMPONENTS ARE BEING REMOVED.
3. Raise vehicle.
4. Remove right front lower splash shield.
5. Torque discharge line-to-compressor bolt.
Torque:
Discharge Line-to-Compressor
Bolt: 19 Nm (14 ft-lbs)
6. Install right front lower splash shield and bolts.
Torque:
Right Splash Shield-to-Body
Bolts: 5 Nm (44 in-lbs)
7. Lower vehicle.
8. Connect negative battery cable.
Torque:
Battery Terminal Bolt: 17 Nm (13 ft-lbs)
IMPORTANT:
Do not cover any existing underhood labels when affixing Campaign Completion Label.
9. Affix Campaign Completion Label on a clean and dry surface of radiator core support, in an area clearly visible when hood is raised. (For more information, refer to "Campaign Completion Label" in this bulletin.)