61. Intake Manifold Installation
INTAKE MANIFOLD INSTALLATION(UNIT REPAIR)
INSTALLATION
1. Install intake manifold studs in cylinder head.
Torque:
Intake Manifold-to-Cylinder Head Studs: 6 Nm (60 inch lbs.)
2. Install a new intake manifold gasket onto intake manifold (if necessary).
3. Install intake manifold.
4. Install intake manifold bolts and nuts. Tighten by starting from center bolt and working outward.
Torque:
Intake Manifold to-Cylinder Head Bolts: 10 Nm (89 inch lbs.)
Torque:
Intake Manifold-to-Cylinder Head Nuts: 10 Nm (89 inch lbs.)
5. Install fuel rail assembly.
6. Install fuel rail stud.
Torque:
Fuel Rail Bracket Stud: 10 Nm (89 inch lbs.)
7. Install new throttle body studs if necessary.
Torque:
Throttle Body Studs-to-Cylinder Head: 6 Nm (60 inch lbs.)
8. Install throttle body, gasket may be reused if not damaged.
Torque:
Throttle Body Nuts: 10 Nm (89 inch lbs.)
9. Install pressure regulator vacuum harness.
10. Install knock sensor to engine block.
Torque:
Knock Sensor-to-Engine Block Bolt: 25 Nm (18 ft. lbs.)
11. Install knock sensor connector onto intake manifold.