Operation CHARM: Car repair manuals for everyone.

Shifter A/T: Service and Repair

CONTROL BASE ASSEMBLY
REMOVAL
1. Disable the SIR System.
2. Turn ignition to Off.
3. Remove console.





4. Using a screwdriver disconnect control cable from control base assembly lever.
5. Depress two tabs on control cable assembly and remove.





6. Disconnect park lock cable assembly from control base assembly.
7. Depress the two tabs on the end fitting of park lock cable assembly and remove from control base assembly.

IMPORTANT: For step 8, LHD illustration shown first, RHD Domestic illustration shown second.








8. Disconnect Brake Transaxle Shift Interlock (BTSI) harness connector. (LHD shown, RHD shown below)
9. Remove control indicator assembly (PRND32) bulb.
10. Disconnect two wiring harness retainers from control base assembly.





11. Remove three control base assembly to floorpan nuts and remove assembly.





12. With control base assembly out of vehicle, use a screwdriver to disconnect the BTSI solenoid plastic retainers and remove BTSI solenoid from control base assembly.
13. Using a screwdriver, remove control lever knob assembly retainer. Remove control lever knob assembly.





14. Using a 4.75 mm (3/16 inch) drill bit, drill out two control indicator assembly (PRND32) rivets attaching control indicator assembly to control shift assembly.
15. Remove control indicator assembly (PRND32) from control base assembly and remove old rivets.
16. Remove control tube.

INSTALLATION
1. Install control tube on new control base assembly.
2. Position control indicator assembly (PRND32) on control base assembly and install two shift indicator pop rivets with a rivet gun.





3. Install BTSI solenoid into control base assembly. Connect two plastic retainers to control base assembly.
4. Install control lever knob assembly and retainer.





5. Position control base assembly in vehicle and install three nuts.
Torque:
Control Base Assembly Nuts: 25 Nm (19 ft. lbs.)

IMPORTANT: For step 6, LHD illustration shown first, RHD Domestic illustration shown second.








6. Install the control indicator assembly (PRND32) bulb.(LHD shown here, RHD shown below)
7. Connect BTSI harness connector.
8. Connect two wiring harness retainers to control base assembly.





9. Install the park lock cable assembly into the control base assembly by completely seating two tabs.
10. Connect park lock cable assembly to control base assembly lever.





11. Install control cable assembly into control base assembly by completely seating two tabs.
12. Connect control cable assembly to control base assembly lever, and adjust control cable.
13. Check adjustment of park lock cable assembly.
14. Install console.
15. Enable the SIR system.