Programming and Relearning
SUNROOF MOTOR SYNCHRONIZATION
SYNCHRONIZATION PROCEDURE
1. Plug the motor/actuator into the harness and provide power until the motor/actuator stops in the vent position. If the motor does not operate when powered, then the motor is already in the vent position.
IMPORTANT: Verify that both the sunroof motor and the sunroof guide mechanisms are in the vent position before you begin the synchronization procedure.
2. If the sunroof window is in the closed position, remove the sunroof window.
3. Verify that the sunroof guide mechanisms are fully forward and in the vent position.
4. Install the sunroof motor/actuator.
5. Install the sunroof window, if necessary.
6. Operate the sunroof to verify proper operation.