Generator Replacement
Generator Replacement
Removal Procedure
1. Open the hood.
Caution: Refer to Battery Disconnect Caution (Battery Disconnect Caution) .
2. Disconnect the battery.
* Remove the negative connection from the ground terminal.
* Loosen the nut.
3. Remove the drive belt. Refer to Drive Belt Replacement (Service and Repair) .
4. Disconnect the generator from the power supply.
* Disconnect the generator from the power supply.
* Remove the 2 nuts (1, 2).
5. Remove the generator.
Remove the 2 bolts (3, 4).
Installation Procedure
Notice: Refer to Fastener Notice (Fastener Notice) .
1. Install the generator.
Tighten the 2 bolts to 35 N.m (25 lb ft).
2. Install the wiring harness to the generator.
Tighten the 2 nuts to 7 N.m (62 lb in).
3. Install the drive belt. Refer to Drive Belt Replacement (Service and Repair) .
4. Connect the battery.
Install the negative connection to the ground terminal.
Tighten the nut to 5 N.m (44 lb in).
5. For programming procedures, refer to Control Module References (Programming and Relearning) .
6. Close the hood.