Installation
2AZ-FE LUBRICATION: OIL PUMP: INSTALLATION
INSTALLATION
1. INSTALL OIL PUMP ASSEMBLY
(a) Install a new gasket and the oil pump with the 3 bolts.
Torque: 19 Nm (194 kgf-cm, 14 ft-lbf)
2. INSTALL OIL PUMP DRIVE GEAR
3. INSTALL NO. 2 CHAIN SUB-ASSEMBLY Installation
4. INSTALL CRANKSHAFT TIMING SPROCKET
5. INSTALL NO. 1 CHAIN VIBRATION DAMPER Installation
6. INSTALL CHAIN SUB-ASSEMBLY Installation
7. INSTALL CHAIN TENSIONER SLIPPER Installation
8. INSTALL TIMING CHAIN GUIDE Installation
9. INSTALL NO. 1 CRANKSHAFT POSITION SENSOR PLATE Installation
10. INSTALL TIMING CHAIN COVER OIL SEAL Replacement
11. INSTALL TIMING CHAIN COVER SUB-ASSEMBLY Installation
12. INSTALL NO. 1 CHAIN TENSIONER ASSEMBLY Installation
13. INSTALL CRANKSHAFT PULLEY Installation
14. INSTALL CAMSHAFT TIMING GEAR ASSEMBLY Installation
15. INSTALL OIL PAN SUB-ASSEMBLY Installation
16. INSTALL CRANKSHAFT POSITION SENSOR Installation
17. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY Installation
18. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY Installation
19. INSTALL IGNITION COIL ASSEMBLY Installation
20. INSTALL ENGINE MOUNTING INSULATOR RH Installation
21. INSTALL VANE PUMP ASSEMBLY
22. INSTALL GENERATOR ASSEMBLY Installation
23. INSTALL FAN AND GENERATOR V BELT Installation
24. INSTALL EXHAUST PIPE ASSEMBLY Installation
25. ADD ENGINE OIL Replacement
26. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
27. CHECK FOR ENGINE OIL LEAKS
28. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY Installation
29. INSTALL FRONT FENDER APRON SEAL RH Installation
30. INSTALL ENGINE UNDER COVER LH
31. INSTALL ENGINE UNDER COVER RH
32. INSTALL FRONT WHEEL RH Installation
33. INSTALL HOOD SUB-ASSEMBLY Adjustments
34. PERFORM INITIALIZATION
Perform initialization Testing and Inspection.
NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.