Operation CHARM: Car repair manuals for everyone.

Installation








2AZ-FE ENGINE CONTROL SYSTEM: CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY: INSTALLATION

INSTALLATION

1. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY





(a) Apply a light coat of engine oil to the O-ring on the camshaft oil control valve assembly.






(b) Install the camshaft oil control valve assembly with the bolt.
Torque: 9.0 Nm (92 kgf-cm, 80 in-lbf)
(c) Connect the camshaft oil control valve assembly connector.






(d) Install the vacuum hose clamp with the bolt.
Torque: 8.5 Nm (87 kgf-cm, 75 in-lbf)
2. INSTALL OUTER COWL TOP PANEL





(a) Install the cowl top panel outer with the 10 bolts.
Torque: 6.0 Nm (61 kgf-cm, 53 in-lbf)






(b) Install the wire harness.
3. INSTALL FRONT WIPER MOTOR AND LINK

4. INSTALL COWL TOP VENTILATOR LOUVER LH

5. INSTALL COWL TOP VENTILATOR LOUVER RH

6. INSTALL HOOD TO COWL TOP SEAL

7. INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY LH

8. INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY RH

9. INSTALL WINDSHIELD WIPER ARM COVER

10. INSPECT FOR OIL LEAK
11. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY Installation