Pressure Regulating Solenoid: Testing and Inspection
MEASURE VOLTAGE SIGNAL FROM TCMMeasuring TCM Voltage Signal Output:
1. Warm up engine and transmission.
2. Ignition switch ON (engine not running).
3. Move shift lever to "N."
4. While opening and closing throttle valve, measure voltage between TCM connector and body.
Connector & Terminal Resistance
(B52) 11 - 13 1.5 - 4.0V (throttle fully closed)
0.5V, maximum (throttle fully open)
Select Monitor Function Mode F11
Condition: Ignition switch ON (engine OFF) N range
Specified data: PLDTY F11
5% (throttle fully open)
100% (throttle fully closed)
CHECK HARNESSES AND CONNECTORS BETWEEN TCM AND DUTY SOLENOID A AND TCM AND RESISTOR
Checking Harnesses And Connectors:
1. Unplug TCM connector.
2. Unplug connector from transmission.
3. Unplug connector from resistor.
4. Measure resistance between TCM connector and transmission, and between TCM connector and body.
Connector & Terminal Resistance
(B52) 11 - (B9) 7 0 Ohms
(B52) 11 - body 1 M Ohms, minimum
Checking Harnesses And Connectors:
5. Measure resistance between TCM connector and resistor connector and between TCM connector and body.
Connector & Terminal Resistance
(B52) 12 - (B1) 1 0 Ohms
(B52) 12 - body 1 M Ohms, minimum
CHECK DUTY SOLENOID A GROUND LINE
Check Duty Solenoid A Ground:
1. Unplug connector from transmission.
2. Measure resistance between transmission connector receptacle (on transmission) and transmission case.
Connector & Terminal Resistance
(T4) 4 - transmission 1 Ohm maximum
CHECK RESISTOR
Check Resistor:
1. Unplug resistor connector.
2. Measure resistance between resistor terminals.
Resistance: 9 - 15 Ohms
CHECK DUTY SOLENOID A
Check Duty Solenoid A:
1. Unplug connector from transmission.
2. Measure resistance between transmission connector receptacle (on transmission) terminals.
Connector & Terminal Resistance
(T4) 7 - 4 2.0 - 4.5 Ohms