Operation CHARM: Car repair manuals for everyone.

Installation

INSTALLATION





1) Install oil pressure switch onto engine block.

Tightening torque:
25 ± 3 Nm (2.5 ± 0.3 kg-m, 18.1 ± 2.2 ft-Ib)


2) Connect terminal of oil pressure switch.





3) Install generator on bracket and temporary tighten installing bolts.





4) Install front side V-belt and adjust it.
5) Install V-belt cover.





6) Connect connector and terminal to generator.