Ignition Shut Down Relay (For Antitheft): Testing and Inspection
INSPECTION / Interrupt Relay
Measure interrupt relay resistance between terminals (indicated in the table) when connecting the battery to terminals No.1 and No.4.
If NG, replace the interrupt relay.