Operation CHARM: Car repair manuals for everyone.

Preparation For Overhaul Procedure

Preparation for Overhaul

PROCEDURE
1. Clean oil, grease, dirt and dust from transmission.
2. Remove the drain plug to drain oil.
3. Tighten the drain plug using new gasket.
Tightening torque: 44 Nm (4.5 kgf-m, 32.5 ft. lbs.)
4. Attach the transmission to ST.
ST 499937100 TRANSMISSION STAND
5. Rotating parts should be coated with oil prior to assembly.
6. All disassembled parts, if to be reused, should be reinstalled in the original positions and directions.
7. Gaskets, lock washers and lock nut must be replaced with new ones.
8. Liquid gasket should be used where specified to prevent leakage.