Operation CHARM: Car repair manuals for everyone.

Preparation For Overhaul

PROCEDURE
1. Clean oil, grease, dirt and dust from transmission.





2. Remove the drain plug to drain oil. After draining, retighten it as before.

NOTE: Replace the gasket with a new one.

Tightening torque:
Oil pan side 44 Nm (4.5 kgf-cm, 32.5 ft. lbs.)
Clutch housing side 70 Nm (7.1 kgf-cm, 51.6 ft. lbs.)





3. Attach the transmission to ST.
ST 18632AA000 STAND ASSY
4. Rotating parts should be coated with oil prior to assembly.
5. All disassembled parts, if to be reused, should be reinstalled in the original positions and directions.
6. Gaskets, lock washers and lock nut must be replaced with new ones.
7. Liquid gasket should be used where specified to prevent leakage.