Power Window Switch: Testing and Inspection
Power Window Control SwitchINSPECTION
1. MAIN SWITCH
Measure the switch resistance.
NOTE:
- Make sure the battery voltage is applied to the terminal No. 13(+) and 5(-), when measuring resistance, because the main switch is controlled by microcomputer.
- Make sure that the window lock switch is measured in the UNLOCK position.
Replace the main switch if faulty.
2. SUB SWITCH
Measure the switch resistance.
Replace the sub switch if faulty.