Operation CHARM: Car repair manuals for everyone.

Installation

INSTALLATION

PITCHING STOPPER

1) Install the pitching stopper.

Tightening torque:
T1: 50 N-m (5.1 kgf-m, 36.9 ft-lb)
T2: 58 N-m (5.9 kgf-m, 42.8 ft-lb)





2) Install the air intake chamber and intake boot.
3) Connect the battery ground cable to the battery.

CROSS MEMBER AND CUSHION RUBBER

1) Install the transmission cushion rubber to the transmission, and tighten the bolt (A).
2) Install the transmission cushion rubber to the center crossmember, and tighten the nut (B).

Tightening torque:
Bolt (A): 35 N-m (3.6 kgf-m, 25.8 ft-lb)
NUT (B): 35 N-m (3.6 kgf-m, 25.8 ft-lb)





3) Install the front crossmember and rear crossmember.

Tightening torque:
T1: 70 N-m (7.1 kgf-m, 51.6 ft-lb)
T2: 140 N-m (14.3 kgf-m, 103.3 ft-lb)





4) Remove the transmission jack.
5) Install the heat shield cover.





6) Install the front and center exhaust pipe.
7) Install the rear exhaust pipe and muffler.
8) Lower the vehicle.
9) Connect the battery ground cable to the battery.