Operation CHARM: Car repair manuals for everyone.

Installation

INSTALLATION

BACK-UP LIGHT SWITCH & NEUTRAL POSITION SWITCH

1) Install the back-up light switch & neutral position switch with the harness.

Tightening torque:
32.3 N-m (3.3 kgf-m, 23.8 ft-lb)





2) Connect the connectors of back-up light switch & neutral position switch.
3) Install the air intake chamber and intake boot.
(Non-turbo model)

4) Install the intercooler.
(Turbo model)

5) Connect the battery ground cable to the battery.