Operation CHARM: Car repair manuals for everyone.

Installation

INSTALLATION

1) Pass the transmission harness assembly through the hole of the transmission case.





2) Connect the control valve connector and transmission ground.

Tightening torque:
8 N-m (0.8 kgf-m, 5.9 ft-lb)





3) Apply proper amount of liquid gasket to the entire oil pan mating surface.

Liquid gasket.
THREE BOND 1217B (Part No. K0877YA020) or equivalent





4) Fill the 3 locations of the transmission case excluding the bolt holes with an ample amount of liquid gasket.

Liquid gasket:
THREE BOND 1217B (Part No. K0877YA020) or equivalent





5) Install the oil pan by equally tightening the bolts.

Tightening torque:
5 N-m (0.5 kgf-m, 3.7 ft-lb)

6) Install the front vehicle speed sensor and torque converter turbine speed sensor.

Tightening torque:
7 N-m (0.7 kgf-m, 5.2 ft-lb)

7) Connect the connector to the rear vehicle speed sensor.
8) Install the ATF inlet and outlet pipes.

NOTE:
Use a new copper washer.

Tightening torque:
T1: 25 N-m (2.5 kgf-m, 18.4 ft-lb)
T2: 40 N-m (4.1 kgf-m, 29.5 ft-lb)
T3: 45 N-m (4.6 kgf-m, 33.2 ft-lb)





9) Install the transmission rear crossmember bolt.

Tightening torque:
70 N-m (7.1 kgf-m, 51.6 ft-lb)

10) Install the propeller shaft.
11) Install the heat shield cover.





12) Install the front, center and rear exhaust pipes, and the muffler. (Non-turbo model)
13) Install the center, rear exhaust pipes and the muffler. (Turbo model)
14) Lower the vehicle.
15) Install the transmission harness connector to the stay.
16) Install the pitching stopper.
17) Install the air intake chamber. (Non-turbo model)
18) Install the intercooler. (Turbo model)
19) Fill with the same amount of ATF as drained.
20) Bleed the air of control valve.
21) Inspect the level of ATF.
22) Perform learning control promotion. Programming and Relearning