Installation
INSTALLATION1) Install the TCM.
Tightening torque:
7.5 N-m (0.8 kgf-m, 5.5 ft-lb)
2) Connect the connector to the TCM.
3) Install in the reverse order of removal.
4) Perform Clear Memory 2 operation. Clearing Diagnostic Trouble Codes
5) Execute the learning control promotion. Programming and Relearning
6) Perform the inspection at the end of repair work, and make sure there is no faulty as below;
^ Excessive shift shock
^ Oil leakage from the transmission body, etc.
^ Occurrence of noise caused by interference etc.