Operation CHARM: Car repair manuals for everyone.

Main Relay (Computer/Fuel System): Testing and Inspection

Main Relay

INSPECTION

1. Measure the resistance between main relay terminals.






2. Connect the battery positive terminal to terminal No. 3 and the battery ground terminal to terminal No. 4, and measure the resistance between the main relay terminals.