Power Window Switch: Testing and Inspection
Power Window Control SwitchINSPECTION
1. MAIN SWITCH
1. Remove the main switch.
2. Check the resistance between main switch terminals.
3. Replace the power window main switch if the inspection result is not within the standard value.
2. SUB-SWITCH
1. Remove the sub-switch.
2. Check the resistance between sub-switch terminals.
3. Replace the power window sub-switch if the inspection result is not within the standard value.