Canister Purge Solenoid: Testing and Inspection
Purge Control Solenoid ValveINSPECTION
1. PURGE CONTROL SOLENOID VALVE
1. Check that the purge control solenoid valve has no deformation, cracks or other damages.
2. Measure the resistance between the purge control solenoid valve terminals.
- Other than U5 model
- U5 model
3. Check that air does not come out from (B) when air is blown into (A).
- Other than U5 model
- Purge control solenoid valve 2
4. Connect the terminal No. 1 to the battery positive terminal and the terminal No. 2 to the battery ground terminal. Check that air is discharged from (B), when supplying air to (A).
- Other than U5 model
- U5 model
2. OTHER INSPECTIONS
Check that the evaporation hose has no cracks, damage or loose part.