Operation CHARM: Car repair manuals for everyone.

Installation

INSTALLATION

BACK-UP LIGHT SWITCH & NEUTRAL POSITION SWITCH

1) Install the back-up light switch & neutral position switch with the harness.

NOTE:
Use a new gasket.

Tightening torque:
32.3 Nm (3.3 kgf-m, 23.8 ft-lb)





2) Lower the vehicle.
3) Connect the connectors of back-up light switch & neutral position switch.
4) Install the air intake boot assembly. (non-turbo model)
5) Install the intercooler. (turbo model)
6) Install the collector cover. (turbo model)
7) Connect the battery ground terminal.