Operation CHARM: Car repair manuals for everyone.

Installation

Installation

1. Engine oil pressure switch ASSY installation
(1) Degrease the threaded portion of engine oil pressure switch ASSY.





(2) Apply THREE BOND 1324 to the threaded portion.

CAUTION:
Do not apply THREE BOND 1324 to the oil hole.


Captions in illustration





(3) Install the engine oil pressure switch ASSY.
Standard value:T=18Nm {184kgf-cm} {13.3ft-lbf}

CAUTION:
Do not start the engine within 1 hour after the assembly.


(4) Connect the connector of oil pressure switch.
2. Air cleaner case SUB-ASSY installation
3. Battery negative terminal connection
Standard value:T=6.0Nm {61kgf-cm} {4.4ft-lbf}
4. Engine oil leakage check