Installation
Installation1. Confirm that the front tires are in the straight-ahead position.
2. Install the steering column ASSY.
(1) Install the steering column ASSY into the instrument panel reinforcement ASSY with the two nuts and new bolts.
Standard value:T=40Nm {408kgf-cm} {29.5ft-lbf}
CAUTION:
Be careful not to pinch the wiring harness between the body.
(2) Connect the two connectors to the power steering computer ASSY.
Captions in illustration
(3) Install the wiring harness clamp onto the power steering computer ASSY.
3. Install the steering intermediate shaft ASSY No.2.
(1) Pass the steering intermediate shaft ASSY No.2 through the hole in the body from the vehicle interior side.
(2) Line up the alignment marks and connect the steering intermediate shaft ASSY No.2 to the steering gear ASSY.
Captions in illustration
(3) Attach a new bolt.
Standard value:T=35Nm {357kgf-cm} {26ft-lbf}
(4) Line up the alignment marks and connect the steering intermediate shaft ASSY No.2 to the steering column ASSY.
Captions in illustration
(5) Attach a new bolt.
Standard value:T=35Nm {357kgf-cm} {25.8ft-lbf}
(6) Engage the four tabs and install the dust shield to the vehicle.
4. Install the turn signal switch ASSY W/Steering roll connector.
(1) Install the turn signal switch ASSY W/Steering roll connector onto the steering column ASSY when the clamp is loose.
(2) Engage the tabs on the turn signal switch ASSY W/Steering roll connector with the steering column ASSY and tighten the clamp.
(3) Connect each connector to the turn signal switch ASSY W/Steering roll connector.
5. Install the steering column cover UPR.
(1) Engage the two tabs and install the steering column cover UPR.
6. Install the steering column cover LWR.
(1) Engage the six tabs and install the steering column cover LWR.
(2) Install the two screws into the steering column cover LWR.
7. Install the steering column hole cover SUB-ASSY No.1 (Steering column cover support) (With smart entry)
(1) Engage the 4 tabs and install the steering column hole cover SUB-ASSY No.1 (Steering column cover support).
8. Install the instrument panel meter ornament UPR.
9. Install the meter hood SUB-ASSY.
10. Install the instrument cluster finish panel SUB-ASSY CTR.
11. Steering roll connector centering
12. Install the instrument panel under cover SUB-ASSY No.1
13. Install the instrument side panel RH.
14. Install the steering wheel ASSY
15. Connect the negative battery terminal.
Standard value:T=6.0Nm {61kgf-cm} {4.43ft-lbf}
16. Settings when connecting/disconnecting battery terminals
17. Settings during parts replacement and installation/removal