Park/Neutral Change Switch Inspection
P/N CHANGE SWITCHINSPECTION
Check continuity between terminal (3) and terminal (4) as shown above.
1) When this switch is in "N" position, there should be no continuity.
2) When this switch is in "P" position, there should be continuity.