Preliminary Inspection
Charging System Preliminary Inspection
1. CHECK BATTERY TERMINALS CONNECTION
Check if battery terminals are clean and tight.
Is the inspection result normal?
YES
GO TO 2
NO
Repair battery terminals connection.
2. CHECK FUSE
Check for blown fuse and fusible link.
Is the inspection result normal?
YES
GO TO 3
NO
Be sure to eliminate cause of malfunction before installing new fuse or fusible link.
3. CHECK GENERATOR GROUND TERMINAL CONNECTION
Verify connector E209 terminal 5 (generator ground harness) is clean and tight.
Is the inspection result normal?
YES
GO TO 4
NO
Repair connection.
4. CHECK DRIVE BELT TENSION
Check drive belt tension. Refer to [Checking Drive Belts] Testing and Inspection (QR25DE) or [Checking Drive Belts] Testing and Inspection (VQ40DE).
Is the inspection result normal?
YES
Inspection End.
NO
Repair as needed.