Operation CHARM: Car repair manuals for everyone.

Valve Body Assembly

ASSEMBLY OF VALVE BODY



1. POSITION NEW N0.1 GASKET ON UPPER VALVE BODY
Align a new No.1 gasket at each bolt hole.

2. POSITION VALVE BODY PLATE ON N0.1 GASKET
Align the plate at each bolt hole.




3. POSITION NEW N0.2 GASKET ON PLATE
Align a new No. 2 gasket at each bolt hole.




4. PLACE UPPER VALVE BODY WITH PLATE AND GASKETS ON TOP OF LOWER VALVE BODY
Align each bolt hole and gasket in the valve body.




5. INSTALL THE TWENTY-FIVE BOLTS TO UPPER VALVE BODY

HINT: Each bolt length (mm, in.) is indicated in the figure.

Torque: 6.4 N.m (65 kgf.cm, 56 in.lbf)




6. INSTALL MANUAL VALVE

7. INSTALL DETENT SPRING

Torque: 10 N.m (100 kgf.cm, 7 ft.lbf)

8. MAKE SURE MANUAL VALVE MOVES SMOOTHLY