Operation CHARM: Car repair manuals for everyone.

Heated Glass Element Switch: Testing and Inspection




INSPECT DEFOGGER SWITCH CONTINUITY
Push the defogger switch and check that continuity exists between terminals 7 and 10.
If continuity is not as specified, replace integration control panel.