Operation CHARM: Car repair manuals for everyone.

Removal and Installation

COMPRESSOR AND MAGNETIC CLUTCH

Compressor And Magnetic Clutch (Part 1):




Compressor And Magnetic Clutch (Part 2):






REMOVAL

1. RUN ENGINE AT IDLE SPEED WITH A/C ON FOR APPROX. 10 MINUTES

2. STOP ENGINE

3. DISCONNECT NEGATIVE (-) TERMINAL CABLE FROM BATTERY

4. DISCHARGE REFRIGERANT FROM REFRIGERATION SYSTEM

5. 5VZ-FE engine
REMOVE ENGINE UNDER COVER

6. 5VZ-FE engine
DISCONNECT DISCHARGE AND SUCTION HOSES
Remove the 2 bolts and disconnect the both hoses.

NOTE: Cap the open fitting immediately to keep moisture or dirt out of the system.

7. 2UZ-FE engine
DISCONNECT DISCHARGE AND SUCTION HOSES
Remove the 2 nuts and disconnect the both hoses.

NOTE: Cap the open fitting immediately to keep moisture or dirt out of the system.

8. REMOVE DRIVE BELT

9. 5VZ-FE engine
REMOVE COMPRESSOR
a. Disconnect the connector.
b. Remove the 4 bolts and compressor.

10. 2UZ-FE engine
REMOVE COMPRESSOR
a. Disconnect the connector.
b. Remove the 4 bolts and nut.
c. Remove the cooler bracket.
d. Remove the compressor.

INSTALLATION

1. 5VZ-FE engine
INSTALL COMPRESSOR
a. Install the compressor with the 4 bolts.

Torque: 25 N.m (250 kgf.cm, 18 in.lbf)

b. Connect the connector.

2. 2UZ-FE engine
INSTALL COMPRESSOR
a. Install the compressor with cooler bracket with the 4 bolts and nut.

Torque: 25 N.m (250 kgf.cm, 18 in.lbf)

b. Connect the connector.

3. 5VZ-FE engine
CONNECT DISCHARGE AND SUCTION HOSES
Connect the both hoses with the 2 bolts.

Torque: 10 N.m (100 kgf.cm, 7 in.lbf)

NOTE: Hose should be connected immediately after the caps have been removed.

HINT: Lubricate 2 new O-rings with compressor oil and install them to the hoses.

4. 2UZ-FE engine
CONNECT DISCHARGE AND SUCTION HOSES
Connect the both hoses with the 2 nuts.

Torque: 10 N.m (100 kgf.cm, 7 in.lbf)

NOTE: Hose should be connected immediately after the caps have been removed.

HINT: Lubricate 2 new O-rings with compressor oil and install them to the hoses.

5. INSTALL AND CHECK DRIVE BELT

6. 5VZ-FE engine
INSTALL ENGINE UNDER COVER

7. CONNECT NEGATIVE (-) TERMINAL CABLE TO BATTERY

8. EVACUATE AIR FROM REFRIGERATION SYSTEM

9. CHARGE SYSTEM WITH REFRIGERANT

Specified amount: 600 ± 50 g (21.16 ± 1.76 oz.)

10. INSPECT FOR LEAKAGE OF REFRIGERANT
Using a gas leak detector, check for leakage of refrigerant.
If there is leakage, check the tightening torque at the joints.