Installation
2GR-FE ENGINE CONTROL SYSTEM: VVT SENSOR: INSTALLATION
INSTALLATION
1. INSTALL VVT SENSOR (for Bank 2 Exhaust Side)
(a) Install the VVT sensor with the bolt.
Torque: 10 Nm (102 kgf-cm, 7 ft-lbf)
(b) Connect the VVT sensor connector.
2. INSTALL VVT SENSOR (for Bank 2 Intake Side)
(a) Install the VVT sensor with the bolt.
Torque: 10 Nm (102 kgf-cm, 7 ft-lbf)
(b) Connect the VVT sensor connector.
3. INSTALL VVT SENSOR (for Bank 1 Exhaust Side)
(a) Install the VVT sensor with the bolt.
Torque: 10 Nm (102 kgf-cm, 7 ft-lbf)
(b) Connect the VVT sensor connector.
4. INSTALL VVT SENSOR (for Bank 1 Intake Side)
(a) Install the VVT sensor with the bolt.
Torque: 10 Nm (102 kgf-cm, 7 ft-lbf)
(b) Connect the VVT sensor connector.
5. INSTALL INTAKE AIR SURGE TANK ASSEMBLY Installation
6. INSTALL AIR CLEANER CASE SUB-ASSEMBLY Installation
7. INSTALL AIR CLEANER CAP SUB-ASSEMBLY Installation
8. INSTALL NO. 1 AIR CLEANER INLET Installation
9. INSTALL NO. 2 AIR CLEANER INLET Installation
10. ADD ENGINE COOLANT Service and Repair
11. INSPECT FOR ENGINE COOLANT LEAK Testing and Inspection
12. INSPECT FOR ENGINE OIL LEAK Replacement
13. INSTALL V-BANK COVER SUB-ASSEMBLY Installation
14. INSTALL FRONT OUTER COWL TOP PANEL SUB-ASSEMBLY Installation
15. INSTALL WINDSHIELD WIPER MOTOR ASSEMBLY