Installation
2GR-FE IGNITION: IGNITION COIL AND SPARK PLUG: INSTALLATION
INSTALLATION
1. INSTALL SPARK PLUG
(a) Install the 6 spark plugs.
Torque: 18 Nm (183 kgf-cm, 13 ft-lbf)
2. INSTALL IGNITION COIL ASSEMBLY
(a) Install the 6 ignition coils with the 6 bolts.
Torque: 10 Nm (102 kgf-cm, 7 ft-lbf)
(b) Connect the 6 ignition coil connectors.
3. INSTALL NO. 1 SURGE TANK STAY
NOTE: DO NOT apply oil to the bolt listed below:
(a) Install the No. 1 surge tank stay with the bolt.
Torque: 21 Nm (214 kgf-cm, 15 ft-lbf)
(b) Install the 2 bolts, 2 clamps, and nut.
Torque: 8.3 Nm (84 kgf-cm, 73 in-lbf)
4. INSTALL INTAKE AIR SURGE TANK ASSEMBLY Installation
5. INSTALL AIR CLEANER CAP SUB-ASSEMBLY Installation
6. ADD ENGINE COOLANT Service and Repair
7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
8. INSPECT FOR ENGINE COOLANT LEAK Testing and Inspection
9. INSTALL V-BANK COVER SUB-ASSEMBLY Installation
10. INSTALL COWL TOP PANEL SUB-ASSEMBLY OUTER FRONT Installation
11. INSTALL NO. 1 COWL TOP TO COWL BRACE INNER Installation
12. INSTALL WINDSHIELD WIPER MOTOR AND LINK ASSEMBLY
13. INSTALL FRONT WIPER ARM LH
14. INSTALL FRONT WIPER ARM RH