Installation
U151F AUTOMATIC TRANSAXLE: PARK / NEUTRAL POSITION SWITCH: INSTALLATION
INSTALLATION
1. INSTALL PARK/NEUTRAL POSITION SWITCH ASSEMBLY
(a) Install the park/neutral position switch to the manual valve shaft.
(b) Temporarily install the 2 bolts.
(c) Place a new lock plate and tighten the nut.
Torque: 6.9 Nm (70 kgf-cm, 61 in-lbf)
(d) Temporarily install the control shaft lever.
(e) Turn the lever counterclockwise until it stops, then turn it clockwise 2 notches.
(f) Remove the control shaft lever.
(g) Align the groove with the neutral basic line.
(h) Hold the switch in position and tighten the 2 bolts.
Torque: 5.4 Nm (55 kgf-cm, 48 in-lbf)
(i) Using a screwdriver, bend the tabs of the lock plate.
(j) Install the control shaft lever, washer and the nut.
Torque: 13 Nm (130 kgf-cm, 9 ft-lbf)
(k) Connect the park/neutral position switch connector.
2. CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY
(a) Connect the control cable to the control shaft lever with the nut.
Torque: 13 Nm (133 kgf-cm, 10 ft-lbf)
(b) Install the control cable with a new clip to the bracket.
3. ADJUST PARK/NEUTRAL POSITION SWITCH ASSEMBLY U151F Automatic Transaxle
4. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY OPERATION U151F Automatic Transaxle
5. INSPECT SHIFT LEVER POSITION Adjustments
6. ADJUST SHIFT LEVER POSITION Adjustments
7. INSTALL AIR CLEANER ASSEMBLY Installation
8. INSTALL BATTERY