Operation CHARM
: Car repair manuals for everyone.
Home
>>
Toyota Truck
>>
2008
>>
Sienna FWD V6-3.5L (2GR-FE)
>>
Repair and Diagnosis
>>
Lighting and Horns
>>
Horn
>>
Service and Repair
>>
High Pitched Horn
>>
Installation
Installation
HORN
: HIGH PITCHED HORN: INSTALLATION
INSTALLATION
1.
INSTALL HIGH PITCHED
HORN
(a)
Install the high pitched
horn
with the bolt.
Torque: 20 Nm (199 kgf-cm, 15 ft-lbf)
(b)
Connect the connector.
2.
INSTALL FRONT BUMPER COVER