Operation CHARM: Car repair manuals for everyone.

Installation








METER: COMBINATION METER:

INSTALLATION





1. INSTALL COMBINATION METER ASSEMBLY
(a) Connect the 2 connectors.
(b) Install the combination meter assembly with the 4 screws.
Torque: 7.0 Nm (71 kgf-cm, 62 in-lbf)
2. INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY (Installation)

3. INSTALL LOWER NO. 1 INSTRUMENT PANEL FINISH PANEL (Installation)

4. CONNECT HOOD LOCK CONTROL LEVER SUB-ASSEMBLY (Reassembly)

5. INSTALL INSTRUMENT PANEL HOLE COVER (for Lever Type Parking Brake) (Installation)

6. INSTALL INSTRUMENT PANEL UNDER TRAY (for Pedal Type Parking Brake) (Installation)

7. INSTALL COWL SIDE TRIM BOARD LH (for Regular Cab) (Installation)

8. INSTALL COWL SIDE TRIM BOARD LH (for Access Cab) (Installation)

9. INSTALL COWL SIDE TRIM BOARD LH (for Double Cab) ()

10. INSTALL FRONT DOOR SCUFF PLATE LH (for Regular Cab) (Installation)

11. INSTALL FRONT DOOR SCUFF PLATE LH (for Access Cab) (Installation)

12. INSTALL FRONT DOOR SCUFF PLATE LH (for Double Cab) ()

13. INSTALL FRONT FLOOR FOOTREST (Installation)

14. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque: 3.9 Nm (40 kgf-cm, 35 in-lbf)