Installation
AIR CONDITIONING PANEL:
INSTALLATION
1. INSTALL AIR CONDITIONING CONTROL ASSEMBLY
(a) Connect the 2 connectors.
(b) Engage the 4 clips and install the air conditioning control assembly.
2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque: 3.9 Nm (40 kgf-cm, 35 in-lbf)
NOTE: Refer to PRECAUTION (Service Precautions).