Installation








VOLTAGE INVERTER:

INSTALLATION

1. INSTALL VOLTAGE INVERTER ASSEMBLY





(a) Connect the 2 connectors and install the 2 wire harness clamps.





(b) Install the 6 bolts.
Torque: 7.5 Nm (76 kgf-cm, 66 in-lbf)
Torque: 15 Nm (153 kgf-cm, 11 ft-lbf)
2. INSTALL REAR CONSOLE BOX ASSEMBLY (Installation)

3. INSTALL CONSOLE UPPER REAR PANEL SUB-ASSEMBLY (for Manual Transmission on Separate Seat Type) (Installation)

4. INSTALL CONSOLE UPPER REAR PANEL SUB-ASSEMBLY (for Automatic Transmission on Separate Seat Type) (Installation)

5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque: 3.9 Nm (40 kgf-cm, 35 in-lbf)