Installation
1GR-FE ENGINE CONTROL SYSTEM: ECM:
INSTALLATION
1. INSTALL ECM BRACKET NO.2
Torque: 3 Nm (32 kgf-cm, 28 in-lbf)
2. INSTALL ECM BRACKET
Torque: 3 Nm (32 kgf-cm, 28 in-lbf)
3. INSTALL ECM
Torque: 5 Nm (51 kgf-cm, 44 in-lbf)
4. INSTALL INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY LOWER RH (Service and Repair)
5. INSTALL GLOVE COMPARTMENT DOOR ASSEMBLY (Service and Repair)
6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque: 3.9 Nm (40 kgf-cm, 35 in-lbf)