Installation
2UZ-FE EMISSION CONTROL: AIR INJECTION DRIVER:
INSTALLATION
1. INSTALL AIR INJECTION CONTROL DRIVER ASSEMBLY
(a) Install the air injection control driver assembly with the 3 bolts.
Torque: 8.0 Nm (82 kgf-cm, 71 in-lbf)
(b) Connect the 2 wire harness clamps.
(c) Install the bolt.
Torque: 5.0 Nm (51 kgf-cm, 44 in-lbf)
(d) Connect the 4 air injection control driver connectors.
2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTE: Some systems need to be initialized after the cable is reconnected (Repair Instruction - Initialization).